SwimSignal

Carlingcott Stoneage Lane

Wessex Water · WXW01073

This page collects what public records say about one storm overflow: its permit, how often it spilled, and the improvements recorded for it. It is not a water test and does not say whether the water is fit to swim in. A spill count is not a finding that the overflow broke its permit: overflows may spill in heavy rain under their permits, and nothing here can tell whether a spill was allowed.

The record

CompanyWessex Water
Environment Agency idWXW01073
Name in the company's returnCARLINGCOTT STONEAGE LANE
Permit reference013269, activity 1-STORM/EMERGENCY (2025 return)
TypeStorm discharge at pumping station
Discharges toCAM BROOK (S) (water body: Cam Bk - source to conf Wellow Bk)

The permit reference is as the Environment Agency's annual returns give it. The EA's consents register holds the permit itself, but its licence allows internal use only, so its conditions are not published here.

Swim spots downstream

SwimSignal counts this overflow at 1 swim spot. km is along the river network, through any lake on the way. The model weight is SwimSignal's estimate of how much this overflow's spills count at that spot, not a measurement (how it is worked out).

Spills each year

YearSpillsSpill hoursMonitor uptime
2021–––
20221588.7100%
202331268.1599.97%
202439317.8299.08%
202528155.8299.99%

From the water company's annual return to the Environment Agency, as published: the spill count as the company returned it, and the hours as the Environment Agency works them out from the return's total duration, to two decimal places. Spills are counted by the Environment Agency's 12/24 method: any discharge in the first 12 hours counts as one spill, then one more for each 24 hours with any discharge. A dash: no return for that year. Monitor uptime is the share of the year the monitor worked; a year with low uptime may undercount.

Recent spills

When this page was updated (31 Oct 2026, 20:24), its company's live feed showed it not discharging. The last spill the feed reported ended on 25 October 2026.

How long its spills lasted, 2024 and 2025. How long this overflow's spills lasted in 2024 and 2025, from the water company's monitor records published by the Environment Agency. A record of the past, not a forecast. It says nothing of how much was discharged.

Typical spill3.9 h
Long end22 h
Longest40 h
Spills 202429
Spills 202525

Typical: half its spills were shorter, half longer. Long end: one in ten lasted longer. A spill here is the monitor's events joined when they overlap or start less than an hour apart, so these counts differ from the annual returns' above. More on spill lengths.

Each spill's start and stop times: not listed here. The Environment Agency publishes them for 2024 on, under the Open Government Licence (its start/stop files); this page gives only the summary above.

Improvements recorded

Return yearImprovement activityInvestigation activity
2024No improvement action in reporting periodNo investigation activity in reporting period
2025No improvement action in reporting periodNo investigation activity in reporting period

Word for word from the annual returns. The 2023 return left these columns empty. A year's entry covers that year only; work under way may not show until a later return.

The PR24 WINEP lists no storm overflow improvement action on this overflow's permit.

Not published here: Wessex Water's planned dates (its overflow plan layers), which carry no licence; Water UK's National Storm Overflows Plan, whose terms forbid reuse without written permission.

Send this record

The button opens your own email app with a short, factual draft about this overflow and a link to this page. Read it, change it as you wish, and add the address yourself: SwimSignal sends nothing and keeps no copy.

Send this record

Wessex Water's own contact details are on its contact page. To send the same record to your MP, find your MP on the UK Parliament website.

The draft
Storm overflow Carlingcott Stoneage Lane (WXW01073)

Dear Wessex Water,

I am writing about your storm overflow Carlingcott Stoneage Lane (Environment Agency id WXW01073, permit 013269). It is upstream of River Avon, Warleigh Weir, Bath, where people swim.

Your annual returns to the Environment Agency record 2024: 39 spills, 317.82 hours; 2025: 28 spills, 155.82 hours.

Your 2025 return lists its improvement activity as: "No improvement action in reporting period".

Could you tell me what is planned for this overflow, and when the work is expected to be finished?

The public record I am referring to is here: https://swimsignal.co.uk/overflow/WXW01073/

Thank you.

Sources and credits

Storm overflow annual returns, including permit references and improvement and investigation activity: © Environment Agency copyright and/or database right, Open Government Licence v3.0; the figures are the water companies' own returns. PR24 Water Industry National Environment Programme: © Environment Agency copyright and/or database right 2025. All rights reserved. Published under the Open Government Licence. Spill lengths: Environment Agency storm overflow EDM start/stop data 2024 and 2025, Open Government Licence v3.0. Live status: the water companies via the National Storm Overflow Hub, CC BY 4.0. Spots, distances and model weights: SwimSignal, traced on OS Open Rivers (contains OS data © Crown copyright and database right 2026). Sources: annual returns, PR24 WINEP, start/stop data, National Storm Overflow Hub. All credits and licences.